|
|
Frame_top
Top view of Cyclone mounting frame.
Date: 01/10/2009
Views: 105
|
|
Frame_bottom
Bottom view of Cyclone mounting frame.
Date: 01/10/2009
Views: 65
|
|
Frame_n_crossbars
Cyclone mounting frame plus crossbars
Date: 01/10/2009
Views: 65
|
|
Frame_n_xbars_hanging
Trial fitting of Cyclone mounting frame with crossbars hanging from ceiling joists on 4 threaded rods. Four tennis balls are used for vibration isolation (inspired by Coates and Welter Scanning Electron Microscope which uses 3 tennis balls for isolation
Date: 01/10/2009
Views: 73
|
|
|
Ball_vib_iso1
End view of tennis balls between Cyclone mounting frame and crossbar.
Date: 01/10/2009
Views: 70
|
|
Ball_vib_iso2
Quartering view of tennis balls providing vibration isolation for Cyclone.
Date: 01/10/2009
Views: 75
|
|
Frame_w_felt
Felt is added to frame as cushion between frame and cyclone motor mounting plate.
Date: 11/08/2009
Views: 73
|
|
Frame_w_motor_plate
Motor mounting plate mounted on frame.
Date: 11/08/2009
Views: 62
|
|
|
Motor_plate_cutout
Cut out on motor plate to allow it to clear the electric box on side of motor.
Date: 11/08/2009
Views: 65
|
|
Motor_frame_installed
Motor plate and frame installed on 5 hp motor.
Date: 11/08/2009
Views: 72
|
|
Motor_wires
Motor wired before hanging from ceiling mount.
Date: 11/11/2009
Views: 76
|
|
Relay_in_box
Relay mounted in steel electrical disconnect box.
Date: 11/14/2009
Views: 74
|
|
|
Relay_Box_installed
Relay box installed.
Date: 11/14/2009
Views: 67
|
|
Blower_ball_test_fit
Test fit of motor assembly.
Date: 11/14/2009
Views: 80
|
|
Relay_wired
Relay wired to motor and circuit breaker.
Date: 11/14/2009
Views: 77
|
|
Blower_height_test_fit
Test fit of CV1400 motor assembly with blower housing. There is plenty of clearance for filter stack. I could have hung the CV1800 this way.....
Date: 11/15/2009
Views: 82
|
|
|
Cyclone_assy2_blower
Cyclone attached to blower housing.
Date: 11/24/2009
Views: 93
|
|
Cyclone_assy_side
Another view of cyclone attached to blower housing.
Date: 11/24/2009
Views: 79
|
|
Transition_bolts_inside
The transition is bolted to the plexi blower housing with 2 bolts on each side. Inside view.
Date: 11/24/2009
Views: 82
|
|
Transition_bolts_outside
The transition is bolted to the plexi blower housing with 2 bolts on each side. Outside view.
Date: 11/24/2009
Views: 73
|
|
|
Transition_end_screws
Transition opening with caulk and screws.
Date: 11/24/2009
Views: 78
|
|
Transition_Oend_screws
Transition opening with caulk and screws.
Date: 11/24/2009
Views: 74
|
|
Cyclone_hung_ball_mount
Assembled cyclone hung from ceiling.
Date: 11/25/2009
Views: 105
|
|
Cyclone_side_view
Another view of assembled cyclone hung from ceiling.
Date: 11/25/2009
Views: 76
|