|
|
Cyclone on frame
All connected up
Date: 06/11/2011
Views: 251
|
|
8 inch transition
Transition to 8" insulated duct
Date: 06/11/2011
Views: 198
|
|
Pipe from noise room
Date: 06/11/2011
Views: 192
|
|
Center feed from noise room to drops
Center feed line
Date: 06/11/2011
Views: 170
|
|
|
Main and East Lines
Date: 06/11/2011
Views: 196
|
|
East Wall Drops
Lathe, Chop Saw, and Floor Sweep drops
Date: 06/11/2011
Views: 187
|
|
Another View East
Date: 06/11/2011
Views: 172
|
|
West wall drops
Table saw, Planer/Jointer, and floor sweep drops
Date: 06/11/2011
Views: 168
|
|
|
Another view West
Date: 06/11/2011
Views: 176
|
|
Cheap floor sweep
One of 2 floor sweeps
Date: 06/11/2011
Views: 181
|
|
Transition from 6" to 4"
Date: 06/11/2011
Views: 191
|
|
Bin Sensor wiring connections
Got the wiring done today.
Date: 06/12/2011
Views: 181
|
|
|
McRabbet Woodworks Sensors Installed
Dust bin sensor system from McRabbet Woodworks
Date: 06/12/2011
Views: 219
|
|
Full bin Alarm
This alarm has a strobe and a horn
Date: 06/02/2011
Views: 183
|
|
|